top of page
Pro-Fit and Weld
Previous Projects

Cheal E Wellhead Piping Taranaki

TOPP2 Geothermal Power Plant

Kupe Shut

Dairy Factory Pahiatua

Spooling Te Mahi Hou Project. Culham Eng. Workshop Whangarei

New R.O. ( Reverse Osmosis) plant Pahiatua DF 2016

Site fitting ducting to Evaps. Kawerau Engineering fabed the evaps- Melbourne 2016

PFW installed new screw conveyors, meal bins and platforms. Baiada Proteins 2016

Ducting being lowered in to place on to cooker. Johnny Rodda Left and Graeme Hikuroa Melbourne 2016

Piping Fabrication Te Mahi Hou Marsden Pt

Kinleith Paper Machine 6 Annual Maintenance Shutdowns

Site Fitting Ducting Melbourne

600 UB. Equestrian centre Hampton Downs. 2016

Piping Fab Marsden Pt

Tere Tapsell running PFW night shift crew. 30" P11 Cr/Moly spooling for new furnace . Marsden Point Oil Refinery 2016

Piping fabrication

Critical Spool fabed by Tere Tapsell 45degree with 52.8 degree roll north. Had to be bang on to fit other furnace piping - heavy wall so no flex. 2016
bottom of page
_edited.png)